Luminant
  • Company
  • Corporate Citizenship
  • Contact
  • Careers
  • News

Illinois CCR Rule Compliance Data and Information

  • Home
  • CCR Rule Compliance Data and Information
  • Illinois CCR Rule Compliance Data and Information

The documents and analyses contained herein incorporate only those assets owned by Luminant and its affiliates. The related professional engineering analyses and regulatory compliance demonstrations are those of Luminant, its affiliates and third-party consultants.

Document Key

Documents are filed according to state, generating facility site name, year in which document was posted, the name of the document, and the name of the waste management unit.

For help with this page, please contact CCRWebhelp@luminant.com

Illinois

/il-ccr/Vermilion/2021

weekly-inspections

2021 10 30 Vermilion NAP-OEAP Op Permit App W1838000002-01,03.pdf
2021 10 30 Vermilion NEAP Op Permit App W1838000002-04.pdf
2021 Annual Consolidated Report-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021 Annual Consolidated Report-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Cost Estimate-Vermilion-Pond System-W1838000002‐01-03-04.pdf
2021-Draft EoP GWPS-Vermilion NEAP-W1838000002‐04.pdf
2021-Draft Feasibility Study-Vermilion New Landfill.pdf
2021-Draft Final Closure Plan-Vermilion NAP OEAP -W1838000002‐01,03.pdf
2021-Draft Final Closure Plan-Vermilion NEAP-W1838000002‐04.pdf
2021-Draft GW Modeling Report -Vermilion NAP OEAP-W1838000002‐01,03.pdf
2021-Draft MNA Report Compiled-Vermilion NAP OEAP-W1838000002‐01,03.pdf
2021-Emergency Action Plan-Vermilion-Pond System-W1838000002‐01-03-04.pdf
2021-Fugitive Dust Plan-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021-Fugitive Dust Plan-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Hazard Potential Assessment-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021-Hazard Potential Assessment-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Inflow Design and Flood Control-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021-Inflow Design and Flood Control-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Safety Factor Assessment-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021-Safety Factor Assessment-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Safety and Health Plan-Vermilion-Pond System-W1838000002‐01-03-04.pdf
2021-Structural Stability Assessment-Vermilion-New East Ash Pond-W1838000002‐04.pdf
2021-Structural Stability Assessment-Vermilion-Old East and North Ash Ponds-W1838000002‐01-03.pdf
2021-Unstable Areas and Floodplains-Vermilion NAP OEAP-W1838000002‐01,03.pdf
2021-Unstable Areas and Floodplains-Vermilion NEAP-W1838000002‐04.pdf
2021-Vermilion-Cost Estimate (Redacted)-Pond System-W1838000002‐01-03-04.pdf
2021-Vermilion-Notice Intent to Close NAP_OEAP_NEAP-W1838000002‐01_03_04.pdf
2021-Vermilion Public Meeting Questions Not Answered W1838000002-01,03,04.pdf
Vermilion-DMG-10 mile Public Meetings Notice-W1838000002‐01,03,04.pdf

<< Back to Luminant CCR Compliance Page

Legal Terms and Conditions | Home | Privacy Policy | CCR & ELG Compliance |  © Luminant. All Rights Reserved.