Illinois CCR Rule Compliance Data and Information

  • Home
  • CCR Rule Compliance Data and Information
  • Illinois CCR Rule Compliance Data and Information

The documents and analyses contained herein incorporate only those assets owned by Luminant and its affiliates. The related professional engineering analyses and regulatory compliance demonstrations are those of Luminant, its affiliates and third-party consultants.

Document Key

Documents are filed according to state, generating facility site name, year in which document was posted, the name of the document, and the name of the waste management unit.

For help with this page, please contact CCRWebhelp@luminant.com

Illinois

/il-ccr/Hennepin/2024

weekly-inspections

2024 05 08 HE WAPS Final CMA Nature and Extent rpt-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024 05 17 HE 845.650(d)(2) Offsite Notice-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024 08 09 Hennepin 845 Permit Application Response to Comments.pdf
2024 09 05 Hennepin WAPS Semiann Rem Sel Progr Rpt.pdf
2024 10 24 Hennepin 845 Closure Application Supplement - CAA Addendum-W1550100002-05.pdf
2024 HE AP2 35 IAC Part 845 Annual Consol Rpt-Hennepin-Ash Pond No 2 and No 4-W1550100002‐04-07.pdf
2024 HE EAP 35 IAC Part 845 Annual Consol Rpt-Hennepin-East Ash Pond-W1550100002‐05.pdf
2024 HE OWAP 35 IAC Part 845 Annual Consol Rpt-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024 Hennepin Power Plant Annual EAP Meeting-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2024-Cost Estimate-June 2024-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2024-Hen AP2 2024 1st qtr 35 IAC 845 GW report-Hennepin-Ash Pond No 2 and No 4-W1550100002‐04-07.pdf
2024-Hen AP2 2024 2nd qtr 35 IAC 845 GW report-Hennepin-Ash Pond No 2 and No 4-W1550100002‐04-07.pdf
2024-Hen AP2 2024 3rd qtr 35 IAC 845 GW report-Hennepin-East Ash Pond No. 2-W1550100002‐04.pdf
2024-Hen AP2 2024 4th qtr 35 IAC 845 GW report-Hennepin-Ash Pond No 2 and No 4-W1550100002‐04-07.pdf
2024-Hen EAP 2024 1st qtr 35 IAC 845 GW report-Hennepin-East Ash Pond-W1550100002‐05.pdf
2024-Hen EAP 2024 2nd qtr 35 IAC 845 GW report-Hennepin-East Ash Pond-W1550100002‐05.pdf
2024-Hen EAP 2024 3rd qtr 35 IAC 845 GW report-Hennepin-East Ash Pond-W1550100002‐05.pdf
2024-Hen EAP 2024 4th qtr 35 IAC 845 GW report-Hennepin-East Ash Pond No. 4-W1550100002‐07.pdf
2024-Hen WAPS 2024 1st qtr 35 IAC 845 GW report-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024-Hen WAPS 2024 2nd qtr 35 IAC 845 GW report-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024-Hen WAPS 2024 3rd qtr 35 IAC 845 GW report-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024-Hen WAPS 2024 4th qtr 35 IAC 845 GW report-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2024-Safety and Health Plan 2024 December Update-Hennepin-East Ash Pond-W1550100002‐05.pdf