Luminant
  • Company
  • Corporate Citizenship
  • Contact
  • Careers
  • News

Illinois CCR Rule Compliance Data and Information

  • Home
  • CCR Rule Compliance Data and Information
  • Illinois CCR Rule Compliance Data and Information

The documents and analyses contained herein incorporate only those assets owned by Luminant and its affiliates. The related professional engineering analyses and regulatory compliance demonstrations are those of Luminant, its affiliates and third-party consultants.

Document Key

Documents are filed according to state, generating facility site name, year in which document was posted, the name of the document, and the name of the waste management unit.

For help with this page, please contact CCRWebhelp@luminant.com

Illinois

/il-ccr/Hennepin/2021

weekly-inspections

2021 10 30 Hennepin AP 2&4 Op Permit App W1550100002-04, 07.pdf
2021 10 30 Hennepin EAP Op Permit App W1550100002-05.pdf
2021 10 30 Hennepin WAPS Op Permit App W1550100002-01,03.pdf
2021 Annual Consolidated Report-Hennepin-Ash Pond No 2 and No 4-W1550100002‐04-07.pdf
2021 Annual Consolidated Report-Hennepin-East Ash Pond-W1550100002‐05.pdf
2021 Annual Consolidated Report-Hennepin-West Ash Pond-W1550100002‐01-03.pdf
2021-Cost Estimate-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2021-Draft Final Closure Plan- Hennepin EAP-W1550100002‐05.pdf
2021-Draft GW Modeling Report -Hennepin EAP-W1550100002‐05.pdf
2021-Emergency Action Plan-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2021-Fugitive Dust Plan-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2021-Hazard Potential Assessment-Hennepin-East Ash Pond-W1550100002‐05.pdf
2021-Hennepin-Cost Estimate (Redacted)-Pond System-W1550100002‐01-04-05-07.pdf
2021-Hennepin-DMG-10 mile Public Meetings Notice-W1550100002‐05.pdf
2021-Hennepin-Notice of Intent to Close EAP-W1550100002‐05.pdf
2021-Inflow Design and Flood Control-Hennepin-East Ash Pond-W1550100002‐05.pdf
2021-Safety Factor Assessment-Hennepin-East Ash Pond-W1550100002‐05.pdf
2021-Safety and Health Plan-Hennepin-Pond System-W1550100002‐01-04-05-07.pdf
2021-Structural Stability Assessment-Hennepin-East Ash Pond-W1550100002‐05.pdf
2021-USEPA 257 and IEPA part 845 Periodic Certification 5-year update-Hennepin-East Ash Pond-W1550100002‐05.pdf

<< Back to Luminant CCR Compliance Page

Legal Terms and Conditions | Home | Privacy Policy | CCR & ELG Compliance |  © Luminant. All Rights Reserved.