Illinois CCR Rule Compliance Data and Information

  • Home
  • CCR Rule Compliance Data and Information
  • Illinois CCR Rule Compliance Data and Information

The documents and analyses contained herein incorporate only those assets owned by Luminant and its affiliates. The related professional engineering analyses and regulatory compliance demonstrations are those of Luminant, its affiliates and third-party consultants.

Document Key

Documents are filed according to state, generating facility site name, year in which document was posted, the name of the document, and the name of the waste management unit.

For help with this page, please contact CCRWebhelp@luminant.com

Illinois

/il-ccr/Baldwin/2023

weekly-inspections

2023 05 31 Part 845 GMP Supplement cover letter-Baldwin-W1578510001-01,02,03,06.pdf
2023 07 31 Baldwin BAP Construction Permit Application-W1578510001-06.pdf
2023 10 27 Baldwin BAP 845.650 ASD-W1578510001-06.pdf
2023 Draft Baldwin Bottom Ash Pond Closure Plan-W1578510001-06.pdf
2023 Draft Baldwin Bottom Ash Pond GW modeling report-W1578510001-06.pdf
2023 Illinois 12-Month Coal Combustion Byproducts Report - Baldwin Power Plant-Baldwin-Pond System-W1578510001‐01-02-03-06.pdf
2023-Baldwin BAP 2nd quarter 35 IAC 845 GW report-Baldwin-Bottom Ash Pond-W1578510001-06.pdf
2023-Baldwin BAP 3rd quarter 35 IAC 845 GW report-Baldwin-Bottom Ash Pond-W1578510001-06.pdf
2023-Baldwin BAP 2023 4th quarter 35 IAC 845 GW report-Baldwin-Bottom Ash Pond-W1578510001-06.pdf
2023-Baldwin BAP Part 845 Annual Consolidated Rpt-Baldwin-Bottom Ash Pond-W1578510001-06.pdf
2023- Baldwin Bottom Ash Pond IL 845 Public Meeting Notice 10 Mile-W1578510001-06.pdf
2023-Baldwin FAPS 2nd quarter 35 IAC 845 GW report-Baldwin Fly Ash Pond System-W1578510001-01 02 03.pdf
2023-Baldwin FAPS 3rd quarter 35 IAC 845 GW report-Baldwin-Fly Ash Pond System-W1578510001‐01-02-03.pdf
2023-Baldwin FAPS 2023 4th quarter 35 IAC 845 GW report-Baldwin-Fly Ash Pond System-W1578510001‐01-02-03.pdf
2023-Baldwin FAPS Part 845 Annual Consolidated Rpt-Baldwin-Fly Ash Pond System-W1578510001‐01-02-03.pdf
2023-Baldwin FAPS revised GMP-Aug 2023 -Baldwin-Fly Ash Pond System-W1578510001‐01-02-03.pdf
2023-Baldwin Power Plant Annual EAP Meeting-Baldwin-Pond System-W1578510001‐01-02-03-06.pdf
2023-Cost Estimate June 2023-Baldwin-Pond System-W1578510001‐01-02-03-06.pdf
2023-DMG-Baldwin Cost Estimate-Aug 2023-Baldwin-Pond System-W1578510001‐01-02-03-06.pdf
2023-Draft Final Baldwin Bottom Ash Pond Closure Plan-W1578510001-06.pdf
2023-Draft Final Baldwin Bottom Ash Pond GW Modeling Report-W1578510001-06.pdf
2023-Safety and Health Plan 2023 December Update-Baldwin-Bottom Ash Pond-W1578510001-06.pdf
Multi-Site Sampling Analysis Plan-Baldwin-W1578510001-01,02,03,06.pdf
Multi-site Quality Assurance Project Plan-Baldwin-W1578510001-01,02,03,06.pdf

<< Back to Luminant CCR Compliance Page

Legal Terms and Conditions | Home | Privacy Policy | CCR & ELG Compliance |  © Luminant. All Rights Reserved.